Showing posts with label ABS. Show all posts
Showing posts with label ABS. Show all posts

Tuesday, October 21, 2014

Main Bathroom Renovation - Part Thirteen


The right hand end of the kitchen bulkhead showing (from the right) 3" toilet drain, 3" vertical vent stack (the one that passes up the newly built wall), 2" drain from clawfoot tub, and then a 90 degree bend to continue vertically downward to the basement.



From the left end of the kitchen bulkhead one can barely make out the 2" drain from the shower, then the horizontal drain, to which the 1.5" drain from the main bath vanity joins about halfway, then just to the right of the photo this drain joins the three inch waste stack.



The 2" drain from the left joining the 3" drain from the right. The pex supply lines are those that run through the floor serving the clawfoot tub, toilet, and vanity in the water closet.



It's difficult to imagine that the waste plumbing visible in this bulkhead was previously installed through the floor joists of the bathroom. Acccck!



I spent a total of one hour and thirty five minutes in this position, generally in increments of between two and six minutes each! Not fun, whatsoever...

Sunday, October 19, 2014

Main Bathroom Renovation - Part Ten


View from main bath to water closet end, and door from guest bedroom into w/c. Small ceiling fan and ceiling light box installed, and this wall given roxul insulation for a bit of soundproofing.



Ceiling of main bath, one of the ceiling light boxes, and the large ceiling fan roughed in. The only remnant of the old reno-massacre I was able to re-use was the slightly dropped ceiling framing, but even it had to be modified somewhat. The ABS is venting that collects the vent from the w/c vanity (from left) and the main vanity (just visible coming up the wall in the phote) and directs it across the room to join the shower vent, and subsequently the main vent stack.



Another view of main bath ceiling, toward the built in shower.



The nightmare job... supply and waste and vent plumbing for the w/c vanity, toilet, and main vent, which will then collect the clawfoot tub drain, and proceed to the main stack and join the drains for the shower an main vanity in the left of the photo.



Waste line from w/c vanity that joins the toilet waste line. toilet rough in and pex lines to the w/c vanity are shown here.

Saturday, October 18, 2014

Main Bathroom Renovation - Part Nine



The long exterior wall, in process of being framed. 2x4 studs on 16 centers flat to the wall, and carefully shimmed out to make them vertical, and to produce the correct reveal on the window frame. paired window shims were used to space the studs, which were then screwe into the wooden keys located every fifth course of bricks.



Close up look at the existing window frame, new wall stud, spacers, and wooden key.



Wall framing nearing completion. The black ABS is the main three inch vent stack, with a cleanout installed... This stack will be hidden by the proposed wall that will seperate the main bath area from the water closet.



Wall completed and sprayfoamed. plus a view of the bathroom including the walk in shower. The shower stall will have no foolish glass walls, just a door frame with a swinging patterned or etched glass door.