Showing posts with label pex. Show all posts
Showing posts with label pex. Show all posts

Thursday, October 27, 2016

Main Bathroom Renovation - Part Sixteen - Shluter Kerdi Walk In Shower


The plumbing rough in, with hot and cold Pex supply lines at bottom feeding soldered copper elbows into the main control valve(black),  The mixed temperature water leads up to the diverter (silver), which splits it to the right - Pex runs to handheld shower rough in, and the left - Pex runs to main rainshower head rough in directly above. Everything is carefully blocked out for support and spacing from the proposed finish wall.



A slose up of the main rainshower head and handheld shower head rough in on the left, and main supply control  valve on the right. It helps to keep everything centered! The Kerdi base in the kit is 32 inches wide, and the tape measure is run from cement board to cement board.



The Shluter Kerdi membrane installed, showing the tiled floor and main control valve on the left, and all openings for shower on the right (Main control valve, diverter, handheld and rainshower heads)



Showing the test fitting the stainless drain piece and the shower floor tile (left). and installed after tiles are set, but before grouting (right). The Kerdi drain piece fits ever so neatly in the space taken up by four tiles. This is also where the tiling starts, at and around the drain, then to the head wall of the shower, then down the length of the shower and out to the sides.



The subway tiles climbing the shower wall being laid over the Kerdi Membrane, plus the door opening tiles installed and taped to keep them in place.



A view of the virtually finished walk in shower.  All Moen shower hardware installed, the door frame, tiles are installed and caulked, the outer door trim is in place and primed, and the frameless tempered glass door also installed. The walk in shower has two pot lights, located on center line, about 14 inches from each end, controlled by a dimmer switch.  I all looks a little better than half bad, in my humble opinion.. And it does not leak... and it actually drains properly!

Sunday, October 19, 2014

Main Bathroom Renovation - Part Ten


View from main bath to water closet end, and door from guest bedroom into w/c. Small ceiling fan and ceiling light box installed, and this wall given roxul insulation for a bit of soundproofing.



Ceiling of main bath, one of the ceiling light boxes, and the large ceiling fan roughed in. The only remnant of the old reno-massacre I was able to re-use was the slightly dropped ceiling framing, but even it had to be modified somewhat. The ABS is venting that collects the vent from the w/c vanity (from left) and the main vanity (just visible coming up the wall in the phote) and directs it across the room to join the shower vent, and subsequently the main vent stack.



Another view of main bath ceiling, toward the built in shower.



The nightmare job... supply and waste and vent plumbing for the w/c vanity, toilet, and main vent, which will then collect the clawfoot tub drain, and proceed to the main stack and join the drains for the shower an main vanity in the left of the photo.



Waste line from w/c vanity that joins the toilet waste line. toilet rough in and pex lines to the w/c vanity are shown here.

Wednesday, October 15, 2014

Main Bathroom Renovation - Part Six


Supply and drain for the small vanity in the watercloset at the guest bedroom end of the bathroom.



A view from the walk in shower end to the watercloset. The main door to the bathroom from the landing is on the right of this picture, the exterior wall on the left. Directly ahead is the inside of the former closet door of the guest bedroom, which will now be secondary access to the water closet



Continuing to plane and level the joists. The most any were out was about an eighth of an inch, so there wasn't a huge amount of planing required. the three pieces of blocking (the plane sitting on the first) are in place to support the wall that will partition the main part of the bathroom from the water closet.



Another view of the watercloset vanity with the 3/4 ply subfloor installed. These pex supply lines also serve the toilet located roughly where the photo was taken, and the clawfoot tub located in the main bathroom. They will then run back to a pex manifold located in the basement.



A view showing the main vanity plumbing, and the pex serving the walk in shower. The shower supplies run directly down the wall underneath, to the basement, and make a home run direct to the pex manifold. The vanity supplies do the same, but will further supply a rough in for a two piece attic bathroom directly above this bath.