Main Bathroom Renovation - Part Thirteen


The right hand end of the kitchen bulkhead showing (from the right) 3" toilet drain, 3" vertical vent stack (the one that passes up the newly built wall), 2" drain from clawfoot tub, and then a 90 degree bend to continue vertically downward to the basement.



From the left end of the kitchen bulkhead one can barely make out the 2" drain from the shower, then the horizontal drain, to which the 1.5" drain from the main bath vanity joins about halfway, then just to the right of the photo this drain joins the three inch waste stack.



The 2" drain from the left joining the 3" drain from the right. The pex supply lines are those that run through the floor serving the clawfoot tub, toilet, and vanity in the water closet.



It's difficult to imagine that the waste plumbing visible in this bulkhead was previously installed through the floor joists of the bathroom. Acccck!



I spent a total of one hour and thirty five minutes in this position, generally in increments of between two and six minutes each! Not fun, whatsoever...

Sunday, October 19, 2014

Main Bathroom Renovation - Part Ten


View from main bath to water closet end, and door from guest bedroom into w/c. Small ceiling fan and ceiling light box installed, and this wall given roxul insulation for a bit of soundproofing.



Ceiling of main bath, one of the ceiling light boxes, and the large ceiling fan roughed in. The only remnant of the old reno-massacre I was able to re-use was the slightly dropped ceiling framing, but even it had to be modified somewhat. The ABS is venting that collects the vent from the w/c vanity (from left) and the main vanity (just visible coming up the wall in the phote) and directs it across the room to join the shower vent, and subsequently the main vent stack.



Another view of main bath ceiling, toward the built in shower.



The nightmare job... supply and waste and vent plumbing for the w/c vanity, toilet, and main vent, which will then collect the clawfoot tub drain, and proceed to the main stack and join the drains for the shower an main vanity in the left of the photo.



Waste line from w/c vanity that joins the toilet waste line. toilet rough in and pex lines to the w/c vanity are shown here.

Saturday, October 18, 2014

Main Bathroom Renovation - Part Nine



The long exterior wall, in process of being framed. 2x4 studs on 16 centers flat to the wall, and carefully shimmed out to make them vertical, and to produce the correct reveal on the window frame. paired window shims were used to space the studs, which were then screwe into the wooden keys located every fifth course of bricks.



Close up look at the existing window frame, new wall stud, spacers, and wooden key.



Wall framing nearing completion. The black ABS is the main three inch vent stack, with a cleanout installed... This stack will be hidden by the proposed wall that will seperate the main bath area from the water closet.



Wall completed and sprayfoamed. plus a view of the bathroom including the walk in shower. The shower stall will have no foolish glass walls, just a door frame with a swinging patterned or etched glass door.

Saturday, October 11, 2014

Main Bathroom Renovation - Part Two


A view of some of the notched Joists. Joists are 1-7/8 x 8-3/4, and these were notched about four inches deep.  The two by four was possibly added as a means of providing additional bracing? If that was the thinking, it would not have made any difference.



Close up of one of the notches... Acccck!



Amazing what one finds when tearing out bad renovations. A very slightly damp, and oily IKEA style floor mat, vintage 1984? And some otherwise unidentifiable fabric...



One of the more severely butchered joists, about 6-1/2 inches removed, to accommodate 2" waste, plus hot and cold supply, plus 5 inch HVAC pipe... Acccck!



Beginning to fix up the disaster... 3/4 thick ply braces (about 6" x 24" or so were glued and screwed to 'clamp' the butchered joists in their current (thankfully they had hardly deflected) position. Then 2x6 blocking was installed between each sandwiched joist, about an inch from the parged interior wall.



A view of the beginning of the repair job, all joists sandwiched by 3/4" ply plates, and then blocks installed between all joists.

Friday, October 10, 2014

Main Bathroom Renovation - Part One Of About Ten... Make That Twenty!


Sadly, the only two photographs of the old main bathroom, in early stages of demolition. Vinyl floors, sheet hardboard false tile on the walls, and an atrociously 'eighties 3 piece combination tub and shower. Accck!



A common discovery after peeling up the vinyl floor. Old hardwood wainscot used to piece together where the floor was pulle out to.... yes you guessed it, install plumbing and Hvac by notching out the floor joists! Acccck!