Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts
Tuesday, March 7, 2017
Tuesday, October 21, 2014
Main Bathroom Renovation - Part Thirteen
The right hand end of the kitchen bulkhead showing (from the right) 3" toilet drain, 3" vertical vent stack (the one that passes up the newly built wall), 2" drain from clawfoot tub, and then a 90 degree bend to continue vertically downward to the basement.
From the left end of the kitchen bulkhead one can barely make out the 2" drain from the shower, then the horizontal drain, to which the 1.5" drain from the main bath vanity joins about halfway, then just to the right of the photo this drain joins the three inch waste stack.
The 2" drain from the left joining the 3" drain from the right. The pex supply lines are those that run through the floor serving the clawfoot tub, toilet, and vanity in the water closet.
It's difficult to imagine that the waste plumbing visible in this bulkhead was previously installed through the floor joists of the bathroom. Acccck!
I spent a total of one hour and thirty five minutes in this position, generally in increments of between two and six minutes each! Not fun, whatsoever...
Labels:
ABS,
bulkhead,
kitchen,
main bathroom,
plumbing,
renovation
Sunday, October 19, 2014
Main Bathroom Renovation - Part Ten
View from main bath to water closet end, and door from guest bedroom into w/c. Small ceiling fan and ceiling light box installed, and this wall given roxul insulation for a bit of soundproofing.
Ceiling of main bath, one of the ceiling light boxes, and the large ceiling fan roughed in. The only remnant of the old reno-massacre I was able to re-use was the slightly dropped ceiling framing, but even it had to be modified somewhat. The ABS is venting that collects the vent from the w/c vanity (from left) and the main vanity (just visible coming up the wall in the phote) and directs it across the room to join the shower vent, and subsequently the main vent stack.
Another view of main bath ceiling, toward the built in shower.
The nightmare job... supply and waste and vent plumbing for the w/c vanity, toilet, and main vent, which will then collect the clawfoot tub drain, and proceed to the main stack and join the drains for the shower an main vanity in the left of the photo.
Waste line from w/c vanity that joins the toilet waste line. toilet rough in and pex lines to the w/c vanity are shown here.
Labels:
ABS,
ceiling,
main bathroom,
pex,
plumbing,
renovation
Wednesday, October 15, 2014
Main Bathroom Renovation - Part Six
Supply and drain for the small vanity in the watercloset at the guest bedroom end of the bathroom.
A view from the walk in shower end to the watercloset. The main door to the bathroom from the landing is on the right of this picture, the exterior wall on the left. Directly ahead is the inside of the former closet door of the guest bedroom, which will now be secondary access to the water closet
Continuing to plane and level the joists. The most any were out was about an eighth of an inch, so there wasn't a huge amount of planing required. the three pieces of blocking (the plane sitting on the first) are in place to support the wall that will partition the main part of the bathroom from the water closet.
Another view of the watercloset vanity with the 3/4 ply subfloor installed. These pex supply lines also serve the toilet located roughly where the photo was taken, and the clawfoot tub located in the main bathroom. They will then run back to a pex manifold located in the basement.
A view showing the main vanity plumbing, and the pex serving the walk in shower. The shower supplies run directly down the wall underneath, to the basement, and make a home run direct to the pex manifold. The vanity supplies do the same, but will further supply a rough in for a two piece attic bathroom directly above this bath.
Friday, October 10, 2014
Main Bathroom Renovation - Part One Of About Ten... Make That Twenty!
Sadly, the only two photographs of the old main bathroom, in early stages of demolition. Vinyl floors, sheet hardboard false tile on the walls, and an atrociously 'eighties 3 piece combination tub and shower. Accck!
A common discovery after peeling up the vinyl floor. Old hardwood wainscot used to piece together where the floor was pulle out to.... yes you guessed it, install plumbing and Hvac by notching out the floor joists! Acccck!
Another view of the atrociously appalling job done roughly thirty years ago... And yes, that is a joist that has been notched out to accommodate a 5 inch diameter heating vent! Acccck!
Subscribe to:
Posts (Atom)